Charges & Specifications

Price includes a 1 color direct imprint or 4 color process label on a white container. Deduct $.50 (V) per piece for blank product without an imprint.

Item Size: ECO-2 – 2.5”L x 3”W x 2.5”H; ECO-4 – 3”L x 4”W x 3.25”H; ECO-6 – 3”L x 4”W x 3.25”H; ECO-8 – 3.5”L x 4.5”W x 4.25”H

For color containers, add $.70 (V) per piece for CO-2, add $.85 (V) per piece for CO-4 & 6, add $1.00 (V) per piece for CO-8.

Box Colors: White, Red and Black

Imprint location varies based on container color.

PRINTING

1 Color Direct imprint Set Up

·         $60.00 (V) 

·         PMS Match: $40 (V)

·         Additional Location: $0.50 (V) per piece

·         Imprint Area: ECO-2 – 2”W x 1.5”H; ECO-4 – 2”W x 1.5”H; ECO-8 – 2.75”W x 2”H

·         Repeat setup charges apply and are billed at ½ of the original setup cost.

4 Color Process Label Set Up

·         $60.00 (V) per artwork

·         PMS Match: As close as possible at no charge

·         Imprint Area: ECO-2 – 1.875”W x 1.875”H; ECO-4 – 1.875”W x 1.875”H; ECO-8 – 2.75”W x 2.75”H

·         Repeat setup charges apply and are billed at ½ of the original setup cost.

Paper Proof

·         $5.00 (Z) per artwork.

SAMPLES

Preproduction Sample

·         Not available

Spec Sample

·         Not available

 

 

 

 

 

Shipping Charges & Information

Third Party Shipping

  • Handling Charge: No Charge

Split Shipments

  • $12.50 (V) Per location, after the first location

Drop Shipments

Individual Mailers Knocked Down Flat

  • $1.50 (V)
  • For insertion add: $.30 (V)

International Shipments

  • Add $20 (V) per destination (excludes Canada)
  • RECEIVER OF GOODS will be responsible for all taxes, duties and miscellaneous charges related to the shipment. Declared value will be catalog pricing unless otherwise requested.

Warm Weather Shipping

  • Chocolate products and gummy products require insulated shipping containers and air shipping.
  • For standard shipments, add $15.00 (V) per cooler, per carton
  • For drop shipments, add $5.00 (Z) per cooler, per location

Production Time

  • 10 working days (after credit and art approval, excluding shipping time)